Project Description

Do You Have An Electrical Installation Project We Can Help With?

Contact Us

Project Goliath

Project Details

PROJECT TITLE

Project Goliath

CLIENT

FI Group

MAIN CONTRACTOR

Wates Smartspace

ECO-1 ROLE

Electrical Contractor

DURATION

30 weeks

PROJECT VALUE

​£1.3m

SECTOR

Commercial

Works Undertaken

Eco-1 were engaged to carry out a Cat A fit out on an existing “Toy R Us”. RDC (Regional Distribution Centre) works included:

Electrical strip of redundant electrical services
HV works to include new cabling and full service on 2 No. existing 1000Kva HV transformer
Full and comprehensive service on existing LV package switch panel including new PLC controls
Full and comprehensive service, new controls and remedial works to existing 600Kva standby generator
New LV distribution system to include panel & distribution boards
New Part L metering system throughout
New LED lighting scheme throughout the building
New lighting infrastructure to warehouse
New small power to warehouse
Mechanical power including BMS
Power to roller shutter
Full electrical fit out to the office area to include containment, lighting, small power, fire alarm, ASD, security, access control and CCTV
• Full modification and re-works of existing fire alarm and Air Sampling Detection (Vesda) throughout the warehouse
Upgrade of the existing intruder alarm system
New high definition CCTV system to cover all external spaces and limited internal space
New access control to reception area